I've been feeling very cramped in my sewing room. I have one large table that I use for cutting and pressing, but I find myself constantly having to move things around to accomodate my next step. Tomorrow I'm going to bring another large table in there and have one soley for cutting and one for pressing.
I wound up purchasing an entire bolt of batting this time. I was getting 5 yards at a time, but I've been going through that in two weeks time. This saves me some time, money and lots of frutstration. I spent almost 2 weeks looking for the batting and everyone was out of stock. I had orders I had to fulfill and it was making me very nervous. I finally found some at a Loveland store. The only dilemma now is that it is so large and bulky that cutting it is an issue. I used to cut each time I made a new purse, but I think I'm going to invest an afternoon and cut it all at once, saving me time and the hassle of always having to roll that elephant of a bolt out.
Oh, and the boys have been back from LA...they wound up doing 5 tracks for the movie...2 with Beverly D'Angelo, 1 with Brittany Snow and 2 with Mick Jones, the guitar player from The Clash. So far, only one song has been chosen for the movie and it is going to be played during the rolling credits. We don't know if any more songs will be in the movie, but they will be on the soundtrack for the movie. The name of the movie is "Black Water Transit" and Laurence Fishburne has the starring role. You can read about the movie here: BlackWaterTransit
Wednesday, May 21, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Hi Monika,
I hope that you made it through the storm last night!
Cookie
http://www.cookiesunshine.com
Post a Comment